RAF Cranwell Painting

MOD
Value: £55,000

RAF Cranwell is the home of the Royal Air Force College, the first military air academy in the world. Opened on the fifth of February 1920, it was rebuilt in the 1930s to an elegant, classic design strongly influenced by the architecture of Sir Christopher Wren.

www.raf.mod.uk/rafcranwell/

Project Work

The intricately decorated wrought iron gates and twin lanterns that stand at the entrance of Cranwell’s College Hall reflect the dignity and status of the building. The work of Flight Sergeant Benson, a serving airman who was also a coppersmith and blacksmith, they also date from the 1930s. Bell Group was recently invited to carry out a complete refurbishment of the gates and the lanterns, a project involving the skilled application of 21 carrot-gold leaf to the lettering and detailing of the crests and other ornamentation.

End Result

Our craftsmen completed the immensely satisfying task with the skill and respect it merited, and returned the entrance to its original striking splendour, much to the delight of everyone at RAF Cranwell.

Westfield Shopping Centre Decoration

Leisure
Value: £925,671

The £340m Westfield Shopping Centre in Derby was opened to great acclaim. With over 100 fashion, food and leisure, the Centre has a dynamic and vibrant ambience that is accentuated by its crisp, cool colour schemes and contemporary styling.

uk.westfield.com/derby

Project Work

The Centre was created around and over an existing shopping centre which stayed open during the construction process, so the task of painting and decorating without disrupting commerce presented special challenges. To meet the tight deadlines a dedicated team worked six days a week, scheduling the work in co-operation with the other trades on-site and achieving superlative results. The project involved decorating a huge diversity of surfaces including steelwork, soffits, walls, ceilings, woodwork, blockwork, floors, masonry and pipework with a variety of paints and coatings. An impressive 42,000 litres of paint were used in the project.

End Result

The craftsmanship and quality of the outcome was highly commended and won Bell Group a finalist place in the prestigious “Painter of the Year” competition.

Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Maecenas feugiat consequat diam. Maecenas metus. Vivamus diam purus, cursus a, commodo non, facilisis vitae, nulla.

Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Maecenas feugiat consequat diam. Maecenas metus. Vivamus diam purus, cursus a, commodo non, facilisis vitae, nulla.

Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Maecenas feugiat consequat diam. Maecenas metus. Vivamus diam purus, cursus a, commodo non, facilisis vitae, nulla.

Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Maecenas feugiat consequat diam. Maecenas metus. Vivamus diam purus, cursus a, commodo non, facilisis vitae, nulla.

Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Maecenas feugiat consequat diam. Maecenas metus. Vivamus diam purus, cursus a, commodo non, facilisis vitae, nulla.

Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Maecenas feugiat consequat diam. Maecenas metus. Vivamus diam purus, cursus a, commodo non, facilisis vitae, nulla.

Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Maecenas feugiat consequat diam. Maecenas metus. Vivamus diam purus, cursus a, commodo non, facilisis vitae, nulla.

Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Maecenas feugiat consequat diam. Maecenas metus. Vivamus diam purus, cursus a, commodo non, facilisis vitae, nulla.

Scottish Power Cyclical Sub-station Painting

Public Utilities
Value: £150,000 p.a.

Scottish Power Limited is an energy company with their headquarters located in Glasgow. In 2007 Scottish Power became a subsidiary of the Spanish utility provider Iberdrola, one of the largest electricity utility companies in the world. The company also supplies electricity and gas to homes and businesses around the United Kingdom and generates power for supply to the grid.

www.scottishpower.co.uk

Project Work

The work consists of the maintenance painterwork to 13,500 sub-stations located throughout the West and Border Regions of Scotland. Bell Group UK also undertakes the reactive maintenance works for the Sub-stations, which requires completion within 30 days, however, we aim to complete within seven days.

The Scottish Power project places specific responsibilities with Bell Group UK to ensure a successful project outcome and delivery.

End Result

The collaborative relationship between Scottish Power and Bell Group UK facilitates the continuous successful project outcome. The main overall objective of the painterwork project is to ensure that the sub-stations and engineers facilities are maintained to a high standard.

Partnering

As the last trade to leave, our finish is your clients first impression.

Slider Image: 

Services

Bell Group is one of the largest Painting, Decorating and Building Maintenance contractors in the UK.

Slider Image: 

Test testimonials

Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate

Bell Business Park, Rochsolloch Road, Airdrie ML6 9BG 01236 766878

Branch Manager

David Liguori
01236 766878
01236 747850

Business Development Manager

Sandra Liddell
01236 766878
01236 747850

Case Studies

    We are proud of our work, you can view a full list of completed projects in our case studies section.

    View case Studies here

Bell Group UK is currently the largest dedicated commercial painting contractor in the UK, both in terms of our geographical coverage and our directly employed workforce: - industrial painting and maintenance services are supplied from our specialist teams located throughout the country.

Contact

Questions or enquires? No request is too big or small so please contact us using the details listed. We will be glad to hear from you.

Liz Earle Redecoration

Leisure
Value: £12,786

Liz Earle have had untold requests for a store in the North of England. The Victoria Quarter, in the heart of Leeds, with its stunning juxtaposition of historical and modern architecture, vibrant city culture, and growing acclaim as the shopping destination of the north provided the perfect location.

www.uk.lizearle.com

Project Work

After first being put forward by VQ Management  with whom we have worked successfully at the Victoria Quarter in the past and through competitive tendering,  Bell Group were awarded the decoration package from Dep Construction Services Ltd  for the refit of unit 38-40 Victoria quarters, Housed in elegant Grade 11 listed buildings. The unit was completely stripped back to just the bare brickwork and totally rebuilt internally including new staircases, floors and walls.

End Result

We handed over the completed project within agreed timescales and received thanks from Dep Construction Services Ltd and Liz Earle for a job done to a very high standard of workmanship and quality.

Syndicate content