HMP & YOI Doncaster Redecoration

Facility Management
Value: £40,000

HMP & YOI Doncaster

HMP & YOI Doncaster was built by the prison service and is managed by Serco Group. The prison was built on the site of a former power station in the city centre, on an island between a river and a canal.It opened in June 1994 and is a Category B local prison with a total capacity of 1,145 male prisoners. HMP Doncaster is a prison accommodating both young and adult prisoners.

www.hmpdoncaster.com

Project Work

The projects that we have been tasked to complete are as follows:- The External decoration to Various Buildings within the Prison Including the visitors centre, entrance block, Staff Block and Maintenance yard, the power washing of high level perimeter wall capping,  full redecorations to all External fencing and railings and the Internal decorations to all visitors’ areas, kitchens, search rooms, staircases, prisoners’ corridors, offices and toilets.

End Result

Bell Group has worked as a preferred and CRB Checked Contractor for Serco at the Prison over the last 3 years.